Product Details:
|
Height: | 15-60m | Material: | Q355B Steel |
---|---|---|---|
Surface Treatment: | Hot Dip Galvanized | Design: | ANSI/TIA-222-G |
Life Period: | More Than 25 Years, It Is According To Installing Environment | Tolerance: | ±1% |
Product Name: | Hot Dip Galvanized Metal Tubular Power Utility Poles Steel Tubular Tower For Transmission And Distribution Lines | ||
Highlight: | Galvanized Metal Tubular Power Utility Poles,Q355B Tubular Steel Tower,60m Metal Tubular Steel Tower |
Hot Dip Galvanized Metal Tubular Power Utility Poles Steel Tubular Tower For Transmission And Distribution Lines
china manufacture hot dip galvanized 3 legged triangular radio telecom tower
Triangular steel tower
3 legged self supporting towers are made of triangular angular elements designed on a triangular base pattern. The communication tower is optimized for medium to heavy loads which is used for standard cellular sites.
Mingyuan towers can be equipped with a variety of accessories, such as work or rest platforms, antenna mounts, safety devices, obstruction lights, lightning protection kit and more. All of the accessories can be installed at any desired height and orientation according to customer Specification.
Height | From 15-60m or according to client’s requirement | |||||
Suit for | signal Transmission and Distribution | |||||
Shape | Polygonal or Conical | |||||
Material | Normally Q235B/A36,Yeild Strength≥235MPa | |||||
Q345B/A572,Yeild Strength≥345MPa | ||||||
As well as Hot Rolled coil from ASTM572, GR65,GR50,SS400 | ||||||
Structure | 3 legged | |||||
Tolerance of the dimension | According to client’s requirement | |||||
Surface treatment | Hot-dip-galvanized following ASTM123, or any other standard by client’s requirement | |||||
Joint of Poles | Slip joint, flanged connected | |||||
Standard | ISO9001:2008 | |||||
Length of per section | Within 13M once forming | |||||
Welding Standard | AWS(American Welding Society)D 1.1 | |||||
Production Process | Raw material test-cutting-bending-welding-dimension verify-flange welding-hole drilling-sample assemble-surface clean-galvanization or power coating /painting-recalibration-packages | |||||
Packages | Packing with plastic paper or according to client’s requirement | |||||
Life Period | More than 25 years, it is according to installing environment |
The advantages of a single Tubular Tower are:. The structure is simple and reasonable; the appearance is beautiful; the installation is easy to use and the floor area is smaller than that of the angle steel tower. In terms of safety, the angle tower is higher than the single tower tower, although the single tower tower is the protagonist. However, if the single-Tubular Tower is to achieve higher safety, only the rod diameter should be increased, the wall should be thickened, and high-strength steel should be used for the material. There will be high cost.
1, Cutting 2, Bending 3. Welding 4, Polishing 5, Galvanizing 6, Testing 7. Packing 8. Delivery
Jiangsu Mingyuan Tower Co., Ltd, established in 2009, is situated in Yixing, Jiangsu Province, China, which is near Shanghai with convenient transportation access. It owns the area of 63,000m2 and the production area is about 20,000m2, with the annual output capacity over 30,000 tons.
Our main products: power angular tower, combination tubular poles tower, electric tubular pole, substation structure, iron accessories, lightning rod tower and communications, microwave tower.
We have 500kV transmission line tower, microwave communication tower production license, 220kV power electric pole qualification certificate of steel structure qualification certificates and safety production license, railway steel structure product testing qualified report, SGS inspection report, ISO9001, ISO14001, 18001.
Our foreign market is distributed in America, Europe, Australia, southeast Asia, Philippines, Indonesia, Africa, the Middle East. All of our products meet international quality standards and are greatly appreciated a great reputation in a variety of different markets.
1. Payment:
(1)Telegraphic Transfer(30% advance payment, balance before shipment
(2)Telegraphic Transfer(30% advance payment, balance against copy of documents
(3)Letter of Credit: at sight
2. Lead Time: 2 weeks after confirmed order
3. Delivery way: by sea
Contact Person: Ivy
Tel: 18251565567
Fax: 86-510-80779829